Define which origins, destinations, shipment types and business processes are included in the first release. A clear boundary gives the team something concrete to approve. “Shipping works” is too broad to test.
Record exclusions as well. A release supporting domestic parcels does not establish readiness for pallets or cross-border products. Your interface should direct excluded cases to the established operational process instead of allowing customers to enter a workflow the team has not validated.
Review access with the people responsible for operating the service. A developer leaving the project should not leave production dependent on a personal machine or undocumented configuration.
Test slow processing, unavailable services, validation errors and uncertain booking results. Confirm an operator knows when to wait, retrieve status or escalate. Record the references needed to investigate without exposing secrets.
Verify a customer changing the cart or address receives results for the latest shipment details. Confirm restarting a worker does not lose the operation reference. Test label reprinting without creating another booking. These scenarios reveal gaps which a clean demonstration rarely shows.
Take a representative test order through checkout or order entry, rating, booking, document retrieval, tracking and financial matching. Include the warehouse, customer-service and finance teams in the review.
| Team | Acceptance question |
|---|---|
| Warehouse | Is the shipment ready to prepare and label correctly? |
| Customer service | Is the right shipment visible from the order? |
| Finance | Are the references needed for matching preserved? |
| Engineering | Are failures observable and recoverable? |
Assign a person to each unresolved issue. Avoid replacing operational acceptance with a developer-only sign-off.
After the test process is approved, verify live configuration and run a controlled shipment. Live bookings are real operational actions. Coordinate them with the team handling the goods. Check the resulting service, documents and records before expanding volume.
Keep a rollback or pause procedure which explains how staff continue shipping while the integration is unavailable. Pausing your software does not cancel shipments already booked. Reconcile those records through the appropriate documented process.
During the first operating period, review errors, empty rate results, booking uncertainty and manual corrections daily. Prioritize recurring causes. Keep the official API documentation linked from your internal runbook and revisit the test matrix when shipment profiles or integration behaviour change.
No. Review the full workflow, error handling and operational handoffs, then run a controlled live shipment.
Does pausing an integration cancel booked shipments?No. Existing bookings require reconciliation and any applicable cancellation process defined by the API and service.
This article provides integration planning guidance. Confirm endpoint fields and behaviour in the official documentation before implementation.